Nothing is as COOL as a POOL

Above Ground Pool Installation

When you purchase your own above ground pool, Penguin Pools is your resource to get the pool built. We have an above ground pool division that strictly handles the Above Ground Pool Installation.

Above Ground Pool Installation includes up to 3 hours of bobcat time. Any additional time over 3 hours to excavate, move earth, haul material, etc. is done at $110/hr.

Round Pools

16' : $4,000
18' : $4,000
21' : $4,500
24' : $4,500
27' / 28' : $5,000
30' / 32' : $5,000

Oval Pools

Up to 30' : $6,500
31' - 35' : $6,750
36' - 41' : $7,250

Additional Charges

Flat Bottom, Beaded Liner : $0.00
Overlap Liner : $400
Expandable Liner : $650

Over 24" Elevation change for excavation : $450 per foot, billed in 12" increments

Hard Plumb Equipment Slab : $350
Bury Plumbing lines from Pool to Equipment : $100/foot

Labor Rate per Worker : $120 per hour (Extra labor for but not limited to : increasing elevation, lack of access, de-watering site, site not ready to build, etc. )

Dirt / Earth Removal : Will be bid or quoted out

 

Above Ground Pool Installation Standard Items

  • Excavation, up to 3 hours
    • 3' Overdig for excavation
  • Haul away all garbage and bound up cardboard
  • Pool Installation
    • Patio blocks counter sunk in ground @ grade.
    • Foam Cove
    • Mason sand pool bottom trowled smooth
  • Equipment slab laid out a minimum of 4' - 5' away from the pool.
    • Pool equipment set and plumbed to pool
  • Ladders & Stairs assembled
    • Feet on patio blocks if applicable

Items NOT Included

We can arrange for these items if need by for a charge.
  • Permits, the customer is responsible for all permits
  • Landscaping
    • Retaining walls for any elevation changes
      • Must be a minimum of 4' from the pool
      • No backfilling will be done next to the pool
    • Dirt / Earth Removal
    • Grading, seeding, sod, yard restoration, etc.
  • Gas and Electrical changes for pool equipment.