Penguin Pools is determined to show you what is going to happen when you build an inground vinyl liner swimming pool. The process goes fast, generally 5 – 7 days from dig to water, but it is a huge mess. We are performing major construction and moving a lot of earth to make your backyard oasis.
Penguin Pools is a K-Pro builder for Kafko Manufacturing (supplier) which offers greater warranties and piece of mind. We adhere to strict building policies and code of ethics.
Step-by-Step Construction Pictures (click to open)
- Pool Dig & Excavation
- Truck Dirt off of Job Site
- Verify Elevations
- Layout Pool Walls
- Walls Installed & Staked
- Fun Plumbing Lines
- Prep & Install Main Drains
- Pour Footing Around Swimming Pool
- Footing Goes Around Entire Pool
- Set & Plumb Pool Equipment
- Pour Vermiculite Swimming Pool Bottom
- Install Pool Coping
- Backfill Pool
- Install Vinyl Liner
- Suck Air from Behind Liner
- Fill Pool with Water
- Auto Cover Installed
- $2,499 Upcharge to 20′
- Pour Concrete
- Stamp Concrete
- Install Fence
- 20′ x 50′ Rectangle with Auto Cover, Automation System, Retaining Walls and Stone Decking.
- 20′ x 45′ Rectangle Pool with Auto Cover, Custom Steel Steps, Pergola, & Automation System.
- Free-Form Inground Swimming Pool
- Double Lazy L Swimming Pool